MEPCO Engineering Projects

Power System Studies

  • By mepco
  • October 25, 2026
  • 0 Comment

Power System Studies

Core Business Sector

MEPCO Engineering Projects provides specialized power system analysis, dynamic modeling, electromagnetic transient simulation, and protection coordination for conventional and renewable power generation, utility transmission grids, and heavy industrial facilities. Operating across Egypt, Saudi Arabia, the UAE, and East Africa, our studies ensure system stability, operational security, equipment protection, and strict grid compliance.

Power System Studies

Figure 1: Power systems dispatch control room and dynamic simulation workstation at MEPCO.

Technical Scope & Engineering Capabilities

MEPCO Engineering Projects brings specialized domain knowledge, rigorous modeling standards, and practical site experience to every assignment. Our scope covers:

  • Network Performance and Protection: Load flow analysis, voltage regulation, reactive power dispatch, short circuit analysis (IEC 60909 / ANSI IEEE), numerical protection coordination, motor starting studies, harmonic distortion analysis (IEEE 519), arc flash hazard calculations (IEEE 1584), substation earthing grid design (IEEE 80), and underground cable ampacity sizing.
  • Dynamic Models and Grid Integration: Developing PSSE and PSCAD User-Defined Models (UDM), transient stability simulation, critical clearing time (CCT) determination, small-signal stability analysis, sub-synchronous resonance (SSR/SSCI/SSTI), and full grid compliance verification against national grid codes (EETC, SEC, DEWA, SEWA).
  • Electromagnetic Transients and Insulation: High-frequency transient simulation on PSCAD/EMTDC, Insulation Coordination Studies (ICS per IEC 60071), surge arrester selection and placement, capacitor bank switching transients, Neutral Grounding Reactor (NGR) sizing, Transient Recovery Voltage (TRV) verification on circuit breakers, and transformer inrush energization analysis.
  • Connecting Analysis with Delivery: Project-specific mathematical models and calculations inform physical equipment selection, protection relay settings, and cable sizing; coordinated engineering defines installation requirements; physical contracting translates approved studies into executed reality.
Software Platforms & Computational Tools

ETAP (Electrical Transient and Analysis Program): Load Flow, Short Circuit, Relay Coordination (Star), Motor Acceleration, Harmonic Analysis, Arc Flash, Ground Grid (GGS), Transient Stability, Cable Sizing, Generator Circuit Breaker (GCB) and Isolated Phase Bus (IPB) Sizing.

PSCAD / EMTDC: Electromagnetic Transients (EMT), Insulation Coordination Studies (ICS), Lightning / Switching Overvoltages, Temporary Overvoltages (TOV), Ferro-resonance, Capacitor Bank Switching, and TRV calculations.

Siemens PTI PSSE: User-Defined Model (UDM) development, transmission-level dynamic stability studies, dynamic model acceptance testing (DMAT), and grid compliance studies.

Applicable Standards & Grid Codes

International Standards: IEC 60909, IEC 60071-1/2, IEEE 1584, IEEE 80, IEEE 242, IEEE 399, IEEE 519, IEC 60287, IEC 62271-100, IEEE C37.013.

National Grid Codes: Egyptian Electricity Transmission Company (EETC) Grid Code, Saudi Electricity Company (SEC) Transmission Grid Code, Dubai Electricity & Water Authority (DEWA) Regulations, Sharjah Electricity & Water Authority (SEWA) Regulations.

Methodology & Project Delivery Workflow

Our engineering delivery aligns with MEPCO’s structured 6-stage project execution framework, ensuring quality throughout input verification, design modeling, and client handover:

  1. Stage 01 — Scope & Criteria Definition: Establish study boundaries, utility tie-in data, single-line diagrams, and client objectives.
  2. Stage 02 — Data Audit & Modeling Assumptions: Collect, verify, and validate manufacturer datasheets, impedance tolerances, and site operating configurations.
  3. Stage 03 — Simulation Model Development: Build detailed, validated mathematical digital models in specialized power software.
  4. Stage 04 — Computational Analysis & Verification: Execute base-case and contingency scenarios, conducting rigorous internal peer reviews.
  5. Stage 05 — Client Review & Approval: Present study findings, address technical comments, and participate in technical clarification sessions.
  6. Stage 06 — Final Handover: Deliver formal certified engineering reports, executive summaries, and native simulation model files.
Power System Studies

Figure 2: Extra-high-voltage (EHV) transmission substation modeled and evaluated under dynamic grid disturbances.

Completed Project References (From MEPCO Profile)

Selected project assignments delivered by MEPCO demonstrating our technical execution and regional client trust:

Project Name Client / Authority Location Tools / Mode Scope Executed
Rabigh IPP-2 Conventional Power Plant Elsewedy PSP Company Egypt / KSA PSSE Developing PSSE User-Defined Models; Load Flow and Short-Circuit; Dynamic Stability; Dynamic Model Acceptance; Grid Compliance.
Layyah Combined Cycle Power Plant Sharjah Electricity & Water Authority (SEWA) Sharjah, UAE ETAP Load Flow & Short Circuit; Relay Setting & Coordination; Motor Starting; Transient Stability; AVR Settings & Tap Optimization; GCB & IPB Sizing.
Aweer Power Station ‘H’ Phase IV Dubai Electricity & Water Authority (DEWA) Dubai, UAE ETAP Load Flow & Short Circuit; Relay Setting & Coordination; Motor Starting; Transient Stability; Under Voltage Relay Setting; GCB & IPB Sizing.
Julius Nyerere Hydropower Project (JNHPP) Tanzania Electric Supply Company (TANESCO) Tanzania ETAP Load Flow and Short Circuit; Generator Circuit Breaker (GCB) and Isolated Phase Bus (IPB) Sizing.
AL-GHAT WIND 380/132kV Substation Saudi Electricity Company (SEC) Saudi Arabia PSCAD Insulation Coordination Study (ICS); Surge Arrester Evaluation; Switching & Lightning Overvoltages.
Lekela 250 MW Wind Farm Project EETC, Egypt Egypt PSCAD / ETAP Insulation Coordination Study (ICS); MV Cable Sizing Calculations; Relay Setting and Coordination.
Key Engineering Deliverables & Outputs:
  • Comprehensive Engineering Study Reports with single-line diagrams, contingency evaluation matrices, and executive summaries.
  • Protective Relay Setting Schedules, coordination curves (TCC), and logic tripping diagrams.
  • Equipment Duty Verification Sheets and Circuit Breaker Interrupting Rating Evaluation Tables.
  • Insulation Coordination Reports, Surge Arrester Specification Sheets, and Overvoltage Profiles.
  • Validated, native software simulation files (.etap, .pscad, .sav, .snp, .dll).

Inquire About This Service

Contact MEPCO’s engineering team for technical proposals, study scope definition, or project consultations:

Email: m.khaled@mepco-tds.com | Phone: +20 11 2696 7082 | HQ: 5 Al-Ibrahimia Street, Cairo, Egypt