MEPCO Engineering Projects

Cable Sizing

  • By mepco
  • October 25, 2026
  • 0 Comment

Cable Sizing

Network Performance & Protection

Power cable sizing calculations ensure that medium-voltage and low-voltage underground cables operate reliably without thermal breakdown, excessive voltage drop, or short-circuit thermal damage. MEPCO calculates cable conductor sizes in accordance with IEC 60287, IEC 60364-5-52, and IEEE standards, accounting for soil thermal resistivity, grouping derating, and installation methods.

Cable Sizing

Figure 1: Heavy power cables installed in trenched sand bedding with verified thermal derating.

Technical Scope & Engineering Capabilities

MEPCO Engineering Projects brings specialized domain knowledge, rigorous modeling standards, and practical site experience to every assignment. Our scope covers:

  • Continuous Current Carrying Capacity (Ampacity): Calculating base ampacity and applying derating factors for ambient temperature, grouping, burial depth, and soil thermal resistivity.
  • Steady-State Voltage Drop: Verifying voltage drop limits along feeder runs under full continuous operating load.
  • Motor Starting Voltage Drop: Calculating dynamic voltage dip along cable conductors during motor acceleration to verify minimum motor terminal starting voltage.
  • Short-Circuit Thermal Withstand: Sizing cable phase and neutral conductors against adiabatic and non-adiabatic short-circuit temperature rise.
  • Metallic Sheath / Screen Sizing: Sizing copper wire or tape screens to carry earth fault currents without exceeding insulation damage limits.
  • Underground Duct Bank Thermal Modeling: Analyzing mutual heating in grouped underground cable ducts and backfill materials.
Software Platforms & Computational Tools

Primary Tool: ETAP Underground Cable Sizing & Thermal Analysis Module.

Standards Solvers: IEC 60287 rigorous thermal solver and IEC 60364-5-52 tabulated rating calculators.

Applicable Standards & Grid Codes

Thermal Sizing: IEC 60287 (Electric cables – Calculation of the current rating), IEC 60364-5-52.

Short-Circuit Withstand: IEC 60949 (Calculation of thermally permissible short-circuit currents), IEEE 399.

Methodology & Project Delivery Workflow

Our engineering delivery aligns with MEPCO’s structured 6-stage project execution framework, ensuring quality throughout input verification, design modeling, and client handover:

  1. Stage 01 — Scope & Criteria Definition: Establish study boundaries, utility tie-in data, single-line diagrams, and client objectives.
  2. Stage 02 — Data Audit & Modeling Assumptions: Collect, verify, and validate manufacturer datasheets, impedance tolerances, and site operating configurations.
  3. Stage 03 — Simulation Model Development: Build detailed, validated mathematical digital models in specialized power software.
  4. Stage 04 — Computational Analysis & Verification: Execute base-case and contingency scenarios, conducting rigorous internal peer reviews.
  5. Stage 05 — Client Review & Approval: Present study findings, address technical comments, and participate in technical clarification sessions.
  6. Stage 06 — Final Handover: Deliver formal certified engineering reports, executive summaries, and native simulation model files.
Cable Sizing

Figure 2: Medium-voltage cable terminations verified for short-circuit withstand and thermal capacity.

Completed Project References (From MEPCO Profile)

Selected project assignments delivered by MEPCO demonstrating our technical execution and regional client trust:

Project Name Client / Authority Location Tools / Mode Scope Executed
Lekela 250 MW Wind Farm Project Egyptian Electricity Transmission Company (EETC) Egypt ETAP MV Collector Cable Sizing Calculations, Ampacity Derating, and Voltage Drop Analysis.
Municipal Infrastructure Networks Housing & Military Engineering Authorities Egypt ETAP Underground Distribution Feeder Cable Sizing and Short-Circuit Verification.
Key Engineering Deliverables & Outputs:
  • Comprehensive Cable Sizing Engineering Report detailing calculations across all feeders.
  • Consolidated Cable Schedule including conductor cross-sections, insulation types, lengths, and derated ampacities.
  • Voltage Drop Summary Tables under normal and motor starting conditions.
  • Short-Circuit Thermal Withstand Calculation Sheets.
  • Native ETAP study model file.

Inquire About This Service

Contact MEPCO’s engineering team for technical proposals, study scope definition, or project consultations:

Email: m.khaled@mepco-tds.com | Phone: +20 11 2696 7082 | HQ: 5 Al-Ibrahimia Street, Cairo, Egypt