MEPCO Engineering Projects

Electrical Equipment & Switchgear

  • By mepco
  • October 25, 2026
  • 0 Comment

Electrical Equipment & Switchgear

Contracting (MEP)

MEPCO provides turnkey procurement, assembly, installation, testing, and commissioning of critical power equipment and switchgear. Our contracting portfolio includes medium-voltage air/gas-insulated switchgear (featuring Siemens SIMOPRIME cubicles), oil-immersed and dry-type power transformers, compact package kiosks, low-voltage Motor Control Centers (MCC), industrial earthing, and emergency diesel generators.

Electrical Equipment & Switchgear

Figure 1: Indoor medium-voltage metal-clad switchgear panels (Siemens SIMOPRIME) installed and tested by MEPCO.

Technical Scope & Engineering Capabilities

MEPCO Engineering Projects brings specialized domain knowledge, rigorous modeling standards, and practical site experience to every assignment. Our scope covers:

  • Medium-Voltage Switchgear Installation: Erection, alignment, busbar jointing, torque checking, and internal cabling of metal-clad/metal-enclosed MV switchgear (Siemens SIMOPRIME and equivalent).
  • Power & Distribution Transformers: Offloading, positioning, bushing installation, oil dielectric testing, winding resistance, turns ratio, and termination of oil and cast-resin transformers.
  • Compact Substations (Package Kiosks): Turnkey supply and installation of factory-assembled outdoor package kiosks integrating MV ring main units (RMU), transformers, and LV distribution boards.
  • Low-Voltage Switchboards & MCCs: Assembly and cabling of main low-voltage distribution boards (MLVDB), motor control centers (MCC), sub-distribution panels, and automatic transfer switches (ATS).
  • Emergency Standby Diesel Generators: Installation, exhaust piping, fuel systems, sound attenuated enclosures, and synchronizing control panels for diesel generators of various kVA capacities.
  • Site Acceptance Testing (SAT): Circuit breaker contact resistance, timing tests, CT/VT secondary injection tests, insulation resistance, and dielectric withstand tests.
Software Platforms & Computational Tools

Testing Platforms: Primary injection test sets, secondary injection test equipment (OMICRON), transformer turns ratio (TTR) meters, micro-ohmmeters, and insulation testers.

Applicable Standards & Grid Codes

Switchgear Standards: IEC 62271-200 (AC metal-enclosed switchgear for rated voltages above 1 kV and up to 52 kV), IEC 61439 (Low-voltage switchgear and controlgear assemblies).

Transformer Standards: IEC 60076 series (Power transformers).

Methodology & Project Delivery Workflow

Our engineering delivery aligns with MEPCO’s structured 6-stage project execution framework, ensuring quality throughout input verification, design modeling, and client handover:

  1. Stage 01 — Scope & Criteria Definition: Establish study boundaries, utility tie-in data, single-line diagrams, and client objectives.
  2. Stage 02 — Data Audit & Modeling Assumptions: Collect, verify, and validate manufacturer datasheets, impedance tolerances, and site operating configurations.
  3. Stage 03 — Simulation Model Development: Build detailed, validated mathematical digital models in specialized power software.
  4. Stage 04 — Computational Analysis & Verification: Execute base-case and contingency scenarios, conducting rigorous internal peer reviews.
  5. Stage 05 — Client Review & Approval: Present study findings, address technical comments, and participate in technical clarification sessions.
  6. Stage 06 — Final Handover: Deliver formal certified engineering reports, executive summaries, and native simulation model files.
Electrical Equipment & Switchgear

Figure 2: Distribution transformer installation, cable terminations, and protective barrier configuration.

Completed Project References (From MEPCO Profile)

Selected project assignments delivered by MEPCO demonstrating our technical execution and regional client trust:

Project Name Client / Authority Location Tools / Mode Scope Executed
Supply and Installation of MV Distribution Panel South Cairo Electricity Distribution Company Cairo, Egypt Turnkey Supply Turnkey supply, erection, cabling, and commissioning of medium-voltage distribution panelboards.
Administrative Depot, Berenice Military Base Armed Forces Engineering Authority Berenice, Egypt EPC Package Supply and installation of MV distribution panels, step-down transformers, and emergency diesel generator systems.
Sewage Pumping Station No. 1 Electrical Works Ministry of Housing / NUCA New Beni Suef, Egypt Power Supply Medium-voltage power supply equipment, motor control centers (MCC), soft starters, and power panels.
Key Engineering Deliverables & Outputs:
  • Fully installed, wired, tested, and commissioned switchgear, transformers, and generation systems.
  • Certified Factory Acceptance Test (FAT) and Site Acceptance Test (SAT) records.
  • Protection Relay Configuration Files and Calibrated Setting Sheets.
  • Operation & Maintenance Manuals and As-Built Electrical Drawings.

Inquire About This Service

Contact MEPCO’s engineering team for technical proposals, study scope definition, or project consultations:

Email: m.khaled@mepco-tds.com | Phone: +20 11 2696 7082 | HQ: 5 Al-Ibrahimia Street, Cairo, Egypt